ANALISIS PENGUKURAN KINERJA PELABUHAN LAUT LEMBAR BERDASARKAN KRITERIA KINERJA PELABUHAN DH MUNAH, IW SUTEJA, IGP WARKA GANEC SWARA 12 (1), 1-10, 2018 | 5 | 2018 |
ANALISIS MANAJEMEN RESIKO TERHADAP MUTU BETON HASIL PRODUKSI READYMIX CONCRETE Z NILAWATI, IGP WARKA, I ASHARI GANEC SWARA 13 (1), 13-22, 2019 | 4 | 2019 |
ANALISIS KEBUTUHAN TENAGA KERJA DAN PERALATAN PADA PROYEK PENINGKATAN JALAN: Studi Pada Pelaksanaan Proyek Peningkatan Jalan Pancor-Rempung I ARISANDI, IGP WARKA, Z GAZALBA GANEC SWARA 12 (2), 1-7, 2018 | 2 | 2018 |
PENGENDALIAN BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG J (IRMA UTAMA) RSU PROVINSI NTB MENGGUNAKAN METODE EARNED VALUE IGP Warka, T Handayani, D Asmina Spektrum Sipil 2 (2), 125-136, 2017 | 2 | 2017 |
ANALISIS PRODUKTIVITAS TENAGA KERJA DI AREA PELABUHAN (STUDI PADA PT. ASDP WILAYAH KERJA KAYANGAN LOMBOK TIMUR) RARI PURWANTO, IGP WARKA, I ASHARI GANEC SWARA 13 (1), 37-42, 2019 | | 2019 |
PENGARUH SISTEM PEMBAYARAN TERHADAP CASH FLOW OPTIMAL PADA PROYEK PEMBANGUNAN GEDUNG PENGADILAN NEGERI PRAYA L Wirahman, IGP Warka, A Apriliana Spektrum Sipil 2 (2), 145-157, 2017 | | 2017 |
MODEL OPTIMASI WAKTU DAN TENAGA KERJA MENGGUNAKAN PEMROGRAMAN LINIER PADA PELAKSANAAN PEMBANGUNAN GEDUNG BUDAYA NARMADA A Husya’bani, IGP Warka, LW Wiradarma Spektrum Sipil 3 (1), 69-80, 2017 | | 2017 |
ANALISA PRODUKTIVITAS TENAGA KERJA DI AREA PELABUHAN STUDI PADA PT. ASDP WILAYAH KERJA KAYANGAN LOMBOK TIMUR IGP Warka, I Ashari | | |